SALT CAN 3D FULL V2 February 9 2017 Jan 11 2018 Modified node materials to expand salt pile and add can rim id. Source: Canister and Instrumentation Locations 11092016.pdf Source data in inches, FEHM Mesh in meters Mesh: /scratch/sft/tam/SALT/canister_peter/3D_stack_v2 Zone CAN 1 Zone SALT 2 Zone AIR 3 Zone EDZ 4 Zone ROCK 5 Zone RIM 6 Can center at 0,0 coordinate Can radius = .3048 meters (12 inches) Can length = 1.5 meters (60 inches) Salt Pile Bottom length = 3 meters Salt Pile Top length to incline = 2 meters distance from can to salt top = .6096 (24 inches) distance from wall to can = .6096 (24 inches) distance from can center to salt edge = 1.534 meters (60 inches) distance from wall to salt edge = 2.4384 meters (96 inches) distance from floor to ceiling = 2.4384 meters (96 inches) Linear Spacing .05m near can increasing to .5m away from room Layer Spacing along Y axis is .1 meters Extents: X -6.6040 to 12.0904 meters (-260 to 476 inches) Z -18.1864 to 18.3896 meters (-716 to 724 inches) Y 0 to 4.1 meters (0 to 161.417 inches) ------------------------------------------------------------- 3D Tet Mesh nodes 529368 tet elements 3063684 Volume min = 5.1773935E-05 Volume max = 1.1688361E-02 Total Volume: 2.8034421E+03 Material Zones: Material 1 has 2496 nodes. #nodes/nnodes is 0.471505662426E-02 Material 2 has 17622 nodes. #nodes/nnodes is 0.332887507975E-01 Material 3 has 89046 nodes. #nodes/nnodes is 0.168211907148 Material 4 has 35526 nodes. #nodes/nnodes is 0.671102181077E-01 Material 5 has 384678 nodes. #nodes/nnodes is 0.726674079895 Boundary Nodes: Face top 1 has 2058 nodes. Face bottom 2 has 1974 nodes. Face left_w 3 has 4536 nodes. Face right_e 5 has 4116 nodes. Face back_n 6 has 12604 nodes. Face front_s 4 has 12604 nodes. Files: -rw-r--r-- 1 tamiller sft 156M Feb 10 11:38 tet_full.fehmn -rw-r--r-- 1 tamiller sft 120M Feb 10 11:39 tet_full.stor -rw-r--r-- 1 tamiller sft 408K Feb 10 11:38 tet_full_outside.zone -rw-r--r-- 1 tamiller sft 5.6M Feb 10 11:38 tet_full_material.zone -rw-r--r-- 1 tamiller sft 2.5M Feb 10 11:38 tet_full_multi_mat.zone -rw-r--r-- 1 tamiller sft 2.3M Feb 10 11:38 tet_full_outside_vor.area -rw-r--r-- 1 tamiller sft 65M Feb 10 11:40 tet_full_nodes.dat ------------------------------------------------------------- Jan 11 2018 Adjust salt pile to continue to wall. Assign material 6 to nodes on rim of can. Total possible materials = 6 Material 1 has 1984 nodes. #nodes/nnodes is 0.374786532484E-02 Material 2 has 18520 nodes. #nodes/nnodes is 0.349851138890E-01 Material 3 has 88148 nodes. #nodes/nnodes is 0.166515544057 Material 4 has 35526 nodes. #nodes/nnodes is 0.671102181077E-01 Material 5 has 384678 nodes. #nodes/nnodes is 0.726674079895 Material 6 has 512 nodes. #nodes/nnodes is 0.967191066593E-03